TRANSITIONING
Concrete, water
The concrete bowls are placed on a raw concrete floor. Some of the bowls hold water that slowly sips towards the floor, the floor then takes over and starts to absorb the water.
Concrete, water
The concrete bowls are placed on a raw concrete floor. Some of the bowls hold water that slowly sips towards the floor, the floor then takes over and starts to absorb the water.
REVERB / DIG SPACE / LONDON / 2015
